Pular para o conteúdo principal
  • Portal do Governo Brasileiro
  • Atualize sua Barra de Governo
Início
Buscar: Pesquisador(a) | Publicação
Portuguese Chinese (Simplified) English French German Korean Russian Spanish Swahili Yoruba

Menu principal

  • PESQUISADORES
  • REVISTAS
  • ASSUNTOS
  • PUBLICAÇÕES
Início Technical and economic pre-feasibility study for the construction of septic tank-filter-sinkhole with alternative material

Technical and economic pre-feasibility study for the construction of septic tank-filter-sinkhole with alternative material

Título: 
Technical and economic pre-feasibility study for the construction of septic tank-filter-sinkhole with alternative material
Autor: 
Daiane Cecchin
Ano: 
2021
DOI: 
10.15159/AR.21.129
Revista: 
Agronomy Research
ISSN: 
1406894X
Idioma: 
Inglês
Buscar essa publicação no Google Acadêmico

Publicações com a mesma autoria

Thermo-acoustic environment of a pig farm facility with different superimposed bed materials
Motores movidos a biodiesel como alternativa para a diversificação da matriz energética brasileira
Behavior of swine hosted in facilities with different construction typologies
Durability of coating mortars containing açaí fibers
Acoustic analysis of cement composites with lignocellulosic residues
Thermal environment in growing and finishing pig facilities of different building typologies
Fuzzy index for swine thermal comfort in the nursery stage based on behavior
Behavior and physiological responses of rabbits
Conforto térmico em galpão cunícula em dias com e sem precipitação
Influence of different methods of treating natural açai fibre for mortar in rural construction
  •  
  • 1 de 7
  • próximo ›

Sobre o site | Fale conosco

Versão Alpha. As informações contidas neste site foram importadas do Lattes no dia 20/04/2022.