Pular para o conteúdo principal
  • Portal do Governo Brasileiro
  • Atualize sua Barra de Governo
Início
Buscar: Pesquisador(a) | Publicação
Portuguese Chinese (Simplified) English French German Korean Russian Spanish Swahili Yoruba

Menu principal

  • PESQUISADORES
  • REVISTAS
  • ASSUNTOS
  • PUBLICAÇÕES
Início A satisfiability and workload-based exact method for the resource constrained project scheduling problem with generalized precedence constraints

A satisfiability and workload-based exact method for the resource constrained project scheduling problem with generalized precedence constraints

Título: 
A satisfiability and workload-based exact method for the resource constrained project scheduling problem with generalized precedence constraints
Autor: 
Artur Alves Pessoa
Ano: 
2021
DOI: 
10.1016/j.ejor.2019.07.056
Revista: 
European Journal of Operational Research
ISSN: 
03772217
Idioma: 
Inglês
Buscar essa publicação no Google Acadêmico

Publicações com a mesma autoria

Scheduling the Brazilian football league minimizing extended carry-over effects associated to strength groups
Robust Network Design with Uncertain Outsourcing Cost
Solving Bin Packing Problems Using VRPSolver Models
Enhanced Branch-Cut-and-Price algorithm for Heterogeneous Fleet Vehicle Routing Problems
A strategy for searching with different access costs
Robust constrained shortest path problems under budgeted uncertainty
LEVEL OF REPAIR ANALYSIS INCLUDING FAILURE ANALYSIS AND OPTIMAL LOCATION OF MAINTENANCE FACILITIES AND RESOURCES
Automation and Combination of Linear-Programming Based Stabilization Techniques in Column Generation
The Complexity of Makespan Minimization for Pipeline Transportation
Robust branch-cut-and-price for the capacitated minimum spanning tree problem over a large extended formulation
  • ‹ anterior
  • 2 de 5
  • próximo ›

Sobre o site | Fale conosco

Versão Alpha. As informações contidas neste site foram importadas do Lattes no dia 20/04/2022.